ResearchPrepared: January 2026

2025 Bond Duration and Yield Risk: From Observed Shocks to DV01

Research conclusion

Duration management must address both the size of observed market yield changes and the loss that the same change would produce on a specified bond exposure. In 2025, the 10-year U.S. Treasury benchmark yield declined from 4.57% to 4.18%, a 39 bp fall between the first and last observations. Yet a single +14 bp increase still occurred between adjacent valid trading days. Lower year-end yields do not eliminate the mark-to-market risk experienced along the way. The case uses Treasury bond 91282CLW9, auctioned in January 2025, with a baseline yield of 4.680% and calculated modified duration of approximately 7.86 years. DV01 is approximately $765.42 per $1 million face value. A 50 bp rise in yield produces an approximately -3.84% change in dirty price under full repricing. This is a fixed-settlement-date risk scenario, not a realized return on actual holdings.

1. Instrument and evidence

The report combines two types of evidence. Yield observations for 249 trading days describe 2025 rate levels and 248 adjacent changes. Treasury auction results establish the specific bond’s terms and valuation anchor. The constant-maturity benchmark is not this bond’s daily quotation; the two are kept separate.
Bond termRecorded value
Issuer / CUSIPU.S. Department of the Treasury / 91282CLW9
Coupon / Interest payment frequency4.25% / Interest payment semi-annually
Auction Date / Settlement Date2025-01-07 / 2025-01-15
Maturity date2034-11-15
Highest accepted auction yield4.680%
Official clean price / face value per 10096.631098
Official accrued interest / per 1,000 face value$7.16160
Download yield observations · View the full-size yield shock chart

2. Observed yield shocks in 2025

The bar chart shows differences between adjacent observed yields, in bp; positive values indicate yield increases. For a long position in a bond with fixed cash flows, this direction implies downward price pressure, other things equal. 1 bp equals 0.01 percentage points: the difference between 4.15% and 4.01% is 14 bp, not a 14% investment return.
Observation dateDGS10 yieldChange from the previous valid trading day
2025-04-034.06%-14 bp
2025-04-074.15%+14 bp
2025-08-014.23%-14 bp
2025-01-154.66%-12 bp
2025-03-284.27%-11 bp
The table selects the five largest absolute changes, with ties ordered by date. Missing holiday observations are not filled with zeros, and changes spanning weekends are not forced into a single-calendar-day interpretation. The sample describes the scale of historical moves; it neither establishes the probability of the next shock nor attributes a particular day’s move to one news item.

3. Reconcile price to cash flows

The semiannual coupon is $2.125 per 100 face value. There are 20 remaining coupon payments, with an additional 100 principal repayment at maturity. At settlement on 2025-01-15, the previous coupon date is 2024-11-15 and the next is 2025-05-15. The full coupon period has 181 days, with 61 elapsed and 120 remaining until the next payment. Accrued interest is 2.125 × 61 / 181 = 0.716160. Discounting cash flows under the Treasury reopening convention for the initial fractional coupon period gives a dirty price of 97.347258 and, after subtracting accrued interest, a clean price of 96.631097. The difference from the official clean price of 96.631098 is less than 0.00001 per 100 face value and reflects published precision. The initial period of less than half a year is discounted using simple interest; subsequent full half-year periods use compound discounting. Clean price is the quotation convention, while dirty price includes accrued interest. Percentage sensitivities below use dirty price as the denominator, keeping quoted price separate from cash value.

4. Modified duration, convexity and DV01

MetricCalculated valueInterpretation
Modified duration7.8628 yearsLocal first-order price sensitivity corresponding to changes in yields
convexity74.0560 years²Describes the degree of curvature in the relationship between price and yield
DV01 / per 100 par$0.076542First-order price loss for a 1 bp yield increase
DV01 / face value per 1 millionUSD 765.42Scales linearly with face value; does not represent an actual holding
The first-order approximation is ΔP / P ≈ −modified duration × Δy. Including convexity gives ΔP / P ≈ −modified duration × Δy + 0.5 × convexity × Δy². Δy is entered as a decimal: 50 bp is 0.005. DV01 = dirty price × modified duration × 0.0001. Duration and convexity come from the first and second yield derivatives of the same cash-flow pricing function and are cross-checked using small two-sided yield shocks. Duration is not remaining time to maturity: this bond pays interim coupons, returning cash before the final maturity date.

5. Yield scenarios and approximation error

Hold settlement date, coupon, remaining cash flows and accrued interest fixed, changing only yield to maturity. The clean prices in the table are scenario valuations from the cash-flow model, not historical transaction prices on different dates. Percentage changes are measured against baseline dirty price.
Yield shockRepriced clean priceFull-repricing changeDuration-only approximationDuration + convexity approximation
-100 bp104.6584+8.25%+7.86%+8.23%
-50 bp100.5499+4.03%+3.93%+4.02%
+0 bp96.6311+0.00%0.00%+0.00%
+50 bp92.8926-3.84%-3.93%-3.84%
+100 bp89.3254-7.50%-7.86%-7.49%
For larger shocks, a linear duration approximation omits convexity. For this conventional fixed-rate bond, yield increases and decreases of the same absolute size do not produce symmetric price changes. Including convexity is closer to full repricing, but larger shocks, embedded options or changed cash flows still call for direct repricing. Download scenario calculations · Review inputs, formula conventions and metrics

6. Translate sensitivity into portfolio risk

For an assumed $1 million face value, baseline dirty market value is approximately $973,472.58. A 50 bp yield increase produces a repriced value change of -$37,385.13. This amount uses the example face value; actual dollar risk varies with exposure. At portfolio level, align valuation dates and yield conventions, calculate signed DV01 for each bond, then aggregate long and short exposures. Equal total DV01 does not imply equal risk. Short-end and long-end concentrations may produce different P&L under nonparallel shifts, requiring key rate duration, maturity-bucket shocks and full cash-flow repricing. Hedge ratios depend on the actual instruments and positions. Futures hedging requires contract DV01, the cheapest-to-deliver bond, conversion factors and basis. Assessing limit breaches requires an actual risk budget, liquidity constraints and funding costs. Without these inputs, only sensitivities and assumptions are reported; hedge effectiveness and compliance with risk limits cannot be claimed.

7. Limitations and follow-up tests

Observed yield changes, auction facts and model scenarios are distinct forms of evidence. DGS10 is a constant-maturity benchmark, not a full-year return series for a single CUSIP. This case does not reconstruct a full-year bond total return or include coupon reinvestment, financing costs, transaction costs or bid-ask spreads over a holding period. Yield shocks assume other conditions remain unchanged. Corporate bonds, mortgage-backed securities and bonds with embedded options also require credit spread, prepayment and option-adjusted effective duration considerations. Further work requires bond-level risks based on actual holdings and market quotations, testing shifts across maturities. This example’s duration cannot be applied directly to an entire portfolio. The observation period is 2025; prepared in January 2026. Downloads retain historical data, calculation inputs and scenario results for independent recalculation. Neither historical performance nor scenario sensitivity promises future returns.

Related research

2025 Multi-Asset Allocation Research: Returns, Correlations and Diversification

2025 Multi-Asset Allocation Research: Returns, Correlations and Diversification

Compare full-sample and short-window correlations, examine cross-asset behavior during equity stress and define the limits of allocation conclusions.
2025 Observed Drawdowns and Dollar Risk Scenarios

2025 Observed Drawdowns and Dollar Risk Scenarios

Identify observed peaks, troughs and recovery dates; examine recovery requirements and distinguish notional exposure, account equity and scenario P&L.
2025 U.S. Treasury Yields: Short-End and Long-End Changes

2025 U.S. Treasury Yields: Short-End and Long-End Changes

Compare short- and long-end yields by quarter, distinguishing yield direction, curve shifts and their effects on cash-flow valuation.